Bravis Hospital
01.
Full
02.
Quick fix
03.
Project follow-up
04.
Quality
Interim facility for Bravis Hospital Bergen op Zoom.
In a time frame of three months, Warsco Units in cooperation with main contractor Bergh Bouwsystemen worked out the program of requirements into a representative interim facility. The Casualty Department and the GP Post (two care disciplines with complex patient logistics) have been provided with a fully-fledged interim facility for the next six months during which they have to temporarily leave the original main building.